Advanced Time and Work concepts –starting with Pipes and Cisterns and then moving to Wages Distribution. These topics are extensions of basic Time and Work, but with a twist.
Advanced Time and Work concepts
Pipes and Cisterns
đš Core Concept
- Inlet pipe: Fills the tank â Positive work
- Outlet pipe: Empties the tank â Negative work
đš Basic Formula
- If a pipe fills a tank in x hours â Rate = 1/x
- If a pipe empties a tank in y hours â Rate = â1/y
- Net rate = Sum of all rates
- Time to fill/empty = 1 á Net rate
Example 1: One Inlet, One Outlet
Q: Pipe A fills in 6 hrs, Pipe B empties in 12 hrs. How long to fill the tank?
Solution:
Rate = 1/6 â 1/12 = (2 â 1)/12 = 1/12
Time = 1 á (1/12) = 12 hrs
Example 2: Two Inlets
Q: Pipe A fills in 4 hrs, Pipe B in 6 hrs. How long together?
Solution:
Rate = 1/4 + 1/6 = (3 + 2)/12 = 5/12
Time = 1 á (5/12) = 2.4 hrs
Example 3: Alternate Filling and Emptying
Q: A fills in 3 hrs, B empties in 4 hrs. If both opened together?
Solution:
Rate = 1/3 â 1/4 = (4 â 3)/12 = 1/12
Time = 12 hrs
Shortcut Tip
If A fills in x hrs and B empties in y hrs:
Net time = (x Ă y)/(y â x) (if y > x)
Wages Distribution
đš Core Concept
- Wages are distributed in proportion to work done
- Work done â Efficiency â Time worked
Example 1: Equal Time, Different Efficiency
Q: A can do a job in 10 days, B in 5 days. Total wage = âš900. How to divide?
Solution:
Efficiency: A = 1/10, B = 1/5 â Ratio = 1:2
Total parts = 3 â A gets âš300, B gets âš600
Example 2: Different Time Worked
Q: A and B work together. A works 6 days, B works 4 days. Aâs efficiency = 2 units/day, B = 3 units/day. Total wage = âš1000.
Solution:
Aâs work = 6 Ă 2 = 12 units
Bâs work = 4 Ă 3 = 12 units
Equal work â âš500 each
Example 3: Three Workers
Q: A, B, C work together. A = 10 days, B = 15 days, C = 30 days. Total wage = âš1080.
Solution:
Efficiency: A = 3, B = 2, C = 1 (LCM = 30)
Ratio = 3:2:1 â Total parts = 6
A = âš540, B = âš360, C = âš180